Professional Experience:
02/2014 –
12/2014 LNR Tyler TX (SuddenLink)Project Manager (Contractor)
·
Defined the scope of the project
in collaboration with senior management
·
Created detailed work plan which
identifies and sequences the activities needed throughout the SDLC
·
Develop a schedule for project
completion that effectively allocates the resources to the activities
·
Determine the objectives and
measures upon which the project will be evaluated leading up to completion
·
Reviewed the quality of the work
completed with the project team to ensure it meets the project standards
·
Ensured the project deliverables
were on time, within budget and at the required level of quality
·
Worked with internal leadership to
help drive best practices, standards, and methodology to the PMO and stake
holders.
·
Ensured the change management
process was utilized to maintain profitability and ensure customer
satisfaction.
·
Lead projects relative to
milestone completion while managing to resource and financial budgets.
01/2013 -
12/2013 SCOM (Windstream) Evansville, INProject Manager (Contractor)
·
Defined the scope of the project
in collaboration with senior management
·
Created detailed work plan which
identifies and sequences the activities needed throughout the SDLC
·
Develop a schedule for project
completion that effectively allocates the resources to the activities
·
Determine the objectives and
measures upon which the project will be evaluated leading up to completion
·
Monitored the progress of the
project and made adjustments as necessary to ensure successful completion of
the project
·
Established a communication
schedule to update stakeholders including Executives
·
Reviewed the quality of the work
completed with the project team to ensure it meets the project standards
·
Ensured the project deliverables
were on time, within budget and at the required level of quality
·
Evaluated the outcomes of the
project/sprints as established during the planning phase
07/2011 - 12/2011 NextGen (Verizon Wireless) Santa Monica,
CA
Project Manager (Contractor)
·
Defined the scope of the project
in collaboration with senior management
·
Created detailed work plan which
identifies and sequences the activities needed throughout the SDLC
·
Determine the resources required
to complete the project
·
Develop a schedule for project
completion that effectively allocates the resources to the activities
·
Determine the objectives and
measures upon which the project will be evaluated leading up to completion
·
Monitored the progress of the
project and made adjustments as necessary to ensure successful completion of the
project
·
Developed and implemented complete
project schedules to ensure required dates were met.
·
Created Statements of Work (SOWs),
and RFPs relivent to the project
05/2010 - 7/2011 MobileComm (T-Mobile) Plano,
TX Project
Manager (Contractor)
·
Defined the scope of the project
in collaboration with senior management
·
Created detailed work plan which
identifies and sequences the activities needed throughout the SDLC
·
Develop a schedule for project
completion that effectively allocates the resources to the activities
·
Determine the objectives and
measures upon which the project will be evaluated leading up to completion
·
Reviewed the quality of the work
completed with the project team to ensure it meets the project standards
·
Ensured the project deliverables
were on time, within budget and at the required level of quality
·
Evaluated the outcomes of the
project/sprints as established during the planning phase
·
Worked with internal leadership to
help drive best practices, standards, and methodology to the PMO and stake
holders.
·
Ensured the change management
process was utilized to maintain profitability and ensure customer
satisfaction.
·
Lead projects relative to
milestone completion while managing to resource and financial budgets.
01/2010 - 05/2010 Insight Global, (AT&T) Houston,
TX
Transport Engineer (Contractor)
· Designed, ordered & tested cell site DS1 – DS3s to
support new market build & growth plans
·
Proactively issued monitored and
tracked submitted ASR’s to completion.
·
Assisted with test & turn-up
utilizing REACT200 remote test GUI.
·
Opened CTS Remedy tickets to
request work assignments to core groups
·
Created Granite XNG
paths, segments, network elements & new sites to complete new
services request
02/2009 - 11/2009 TEK Systems, (AT&T) La Jolla, CATransport
Engineer (Contractor)
·
Designed, ordered & tested
cell site DS1 – DS3s to support new market build & growth plans
·
Proactively issued monitored and
tracked submitted ASR’s via VFO to completion.
·
Assisted with test & turn-up
utilizing Centest remote test GUI.
·
Opened CTS Remedy tickets to
request work assignments to core groups
·
Created Granite XNG
paths, segments, network elements & new sites to complete new
services request
01/2008 - 12/2008 Tek Systems (Cingular Wireless) Houston, TXTransport
Engineer (Contractor)
· Designed, ordered & tested cell site DS1 – DS3s to
support new market build & growth plans
·
Proactively issued monitored and
tracked submitted ASR’s to completion.
·
Maintained and updated the Granite
XNG & CTS Remedy circuit inventories, ordering
& site information
·
Created Granite XNG
paths, segments, network elements & new sites to complete new services
request
·
Assisted with test & turn-up
utilizing REACT200 remote test GUI.
02/2007 - 12/2007 Glow Networks, (AT&T) Portland ORTransport
Engineer (Contractor)
· Designed, ordered & tested cell site DS1 – DS3s to
support new market build & growth plans
·
Proactively issued monitored and
tracked submitted ASR’s to completion.
·
Assisted with test & turn-up
utilizing Centest remote test GUI.
·
Maintained Telcordia Granite XNG
& CTS Remedy circuit inventories, ordering & site information
·
Created Telcordia Granite XNG
paths, segments, network elements and new sites
11/2006 – 2/2007 GCI (AT&T) Dublin, CA Project Manager
(Contractor)
· Utilized negotiation and technical skills by collaborating
with Senior Management, Sales & Marketing with preparing responses for
educational RFP’s with AT&T for the Federal E-Rate program.
·
Identified affiliate peer groups
within AT&T based on the type of services and products and being
required.
·
Facilitated stakeholder meetings
to manage scope, timelines & resources.
· Monitored project milestones, resolved product and service
issues, updated project plan until contract award.
03/2005 - 10/2006 Networkers Intl. (Cingular Wireless) Chicago IL. Project
Manager (Contractor)
· Responsible for network and equipment optimization of a
Wireless Telecommunications network.
· Developed project, implementation and optimization plans.
· Worked closely with regional, market and planning teams to
determine the appropriate course of action to reduce cost.
· Researched and analyzed customer billing records utilizing
MS Excel, MS Access, Telcordia Granite XNG, and Bill Tamer to produce final billing and network
configurations.
11/2003 – 2/2005 Mountain LTD (SBC) Dublin CAProgram Manager (Contractor)
· Utilized negotiation and technical skills by collaborating
with Senior Management, Sales & Marketing with preparing responses for
educational RFP’s nationwide with AT&T for the Federal E-Rate program.
·
Identified affiliate peer groups
within AT&T based on the type of services and products and being
required.
·
Facilitated kick-off and
stakeholder meetings to establish a plan of action.
· Monitored project milestones, resolved product and service
issues and updated project plan until contract award.
09/2002 – 11/2003 Terawave Communications, Hayward, CAProject Manager
· Developed ISO and company policies and procedures for the
installation department.
· Designed, developed and produced OEM specialty cables for
use with Terawave PON equipment.
· Established relationships with Service Providers to
outsource installation services.
· Issued RFI’s and RFQ’s to Service Providers to define
possible business relationships
01/2001 – 11/2003
Terawave Communications, Hayward, CA Manager, Customer Care Lab
· Designed, built and maintained customer care and demo
labs. Coordinated customer visits to the demo and customer care lab.
· Procured PON and test equipment for customer field and lab
trials. Provided logistics for international shipments to customer sites.
· Assisted with planning and implementation of live demos at
international tradeshows.
· Ordered test gear, power systems, network & enterprise
equipment, to support the customer lab and field trials.
· Directly responsible for saving the department $800,000.00
by negotiating products and services with vendors.
06/1999 – 12/2000 Tek Systems (Pacific Bell Mobile) Pleasanton
CA
Transport Engineer (Contractor)
· Provisioned/tested DS1 - DS3 circuits via digital cross
connect system from the L.E.C. to various MSC and BSC throughout the mobile
network.
· Maintained test results and circuit inventories for the
regional network.
· Augmented sites that were experiencing blockage or dropped
calls.
01/1998 – 06/1999 Comsys (Kaiser Permanente) Walnut Creek CA
Program Manager (Contractor)
· Committed to providing overall program management to
Federal Government field offices and outside vendors. Interfaced with core
groups daily to resolve L.E.C. and stakeholder issues.
· Facilitated daily standup meetings with, vendors and
L.E.C. Motivated and assisted technical support groups and subordinate
managers within Network Operations and Planning.
· Performed physical site surveys and utilized DID and DOD
call records to determine circuit capacity at each agency.
· Designed cutover plans to migrate existing circuits to the
new fiber optic network
06/1997 – 01/1998 Comsys (Pacific Bell) San Ramon CA
Transport Engineer (Contractor)
· Dedicated to the reconciliation of the DACS IV, Titan and
TIRKS databases.
· Devised and implemented a plan to resolve discrepancies
with-in these databases.
· Issued disconnects against circuits and equipment that was
confirmed to be out of service.
· Produced MS Excel spreadsheets, which were later
transformed into a living database for tracking purposes.
01/1996 – 06/1997 Comsys (US West) Salt Lake City, UTTransport
Engineer (Contractor)
· Coordinated & preformed, remote testing for
installation of DS1 - DS3 circuits with OSP and customer for installation of
new circuits, disconnects and maintenance.
· Transmitted trouble info. Via Telcordia (AMOS/WFA) to
Inside and Outside Plant to complete work assignments.
· Utilized remote testing apparatus, (React 2001/Hekimian,
SARTS, OPS-INE, Titan 5500, AT&T DACS III & IV)
02/1995 – 05/1996 Atlanta Committee of Olympic Games ATL. GAProgram
Manager
· Committed to, planning and implementation of wireless,
voice and data telecommunications services.
· Interfaced with Architectural and Electrical Contractors,
Telecommunications Service providers and equipment vendors during
construction to ensure the design and implementations met International
Olympic Committee standards.
· Determined and provided over-all technical support to
exceed client needs at three Olympic Sports Venues.
· Provided technical support during construction and
sporting events for the 1996 Olympics Games.
06/1992 – 02/1995 Aerotek (US Sprint) ATL. GA Transport
Engineer (Contractor)
· Provided preventative and emergency maintenance on, DS0 -
DS3, OC3 - OC48 and C.P.E.
· Coordinated and performed BERT test with L.E.C. and
Outside Plant on DS0 - DS3, OC3 - OC48.
· Responsible for, remote network surveillance of a
worldwide Fiber Optic and Microwave Network
· Coordinated resolution of network outages with, I.X.C.,
L.E.C. and O.S.P.
· Resolved DS0 - DS3, OC3 - OC48 troubles via remote testing
utilizing, Hekimian /REACT remote test-sets
· Coordinated scheduled maintenance, reconfigurations and
augments
01/1990 – 06/1992 Aerotek (GTE) Sacramento CA
Program Manager (Contractor)
· Committed to providing overall program management to
Federal Government field offices and outside vendors
· Interfaced with core groups daily to resolve L.E.C. and
stakeholder issues.
· Facilitated daily standup meetings with, vendors and
L.E.C. Motivated and assisted technical support groups and subordinate
managers within Network Operations and Planning.
· Performed physical site surveys and utilized DID and DOD
call records to determine circuit capacity at each agency.
· Designed cutover plans to migrate existing circuits to the
new fiber optic network
02/1988 – 12/1989 Aerotek (US Sprint) Kansas City MO
Program Manager (Contractor)
· Committed to providing overall program management to State
of California Government field offices and outside vendors Interfaced with
core groups daily to resolve L.E.C. and stakeholder issues.
· Facilitated daily standup meetings with GSA, AT&T and
L.E.C.
· Motivated and assisted technical support groups and
subordinate managers within Network Operations and Planning.
· Performed physical site surveys and utilized DID and DOD
call records to determine circuit capacity at each agency.
· Designed cutover plans to migrate existing circuits to the
Sprint FON network with information obtained from site surveys.
02/1986 – 02/1988 Salem Technical Services (US
Sprint)
Transport Engineer (Contractor)
· Committed to, producing and tracking Access Service
Request (ASR).
· Coordinated Out-side Plant technicians to complete
detailed installation via M.O.P. specifications.
· Acted as the single point of contact for L.E.C., O.S.P.
and Executive Account Managers.
· Escalated past due circuits with service providers to
resolve roadblocks.
· Migrated existing circuits from the leased analog network
to the Digital Fiber Optic Network.
03/1984 - 01/1986 Northern Telecom ATL. GA
Field System Installer
· Responsible for installation of DMS-1, FD-135 and FD-565
Fiber optic Systems, Channel Banks at Central Offices.
· Performed EF&I of cable rack, bay and light fixtures,
network elements and network cables. Extensive wire wrap terminations on a
sixty-six block. Performed end to end, V.F., and noise test to circuit pack
level.
08/1980 –
03/1984
Northern Telecom ATL. GA
Telecom System Tester
· Performed system testing and troubleshooting to circuit
pack and component levels.
· Responsible for failure isolation and repair in connection
with DMS-1, D4 Channel Bank and Burn-in Chambers.
· Used Spectrum Analyzers, Transmission Test Sets and
automated test equipment to isolate failures.
Certifications
& Training:-